|
19:16 London Victoria to Dartford due 20:11, This train will run short formed with 4 carriages.
17:25 London Paddington to Banbury due 19:45, This train will run short formed with 2 carriages.
Line problem at London Bridge., Train services at London Bridge are being disrupted due to signalling problems.
North Greenwich Station Information, NORTH GREENWICH STATION: No step free access between the ticket hall and the eastbound platform due to a faulty lift.
OverviewNexus Alpha is now engaged in the final phase of a complete redesign of its systems, a redesign that is taking our traditional approach several stages further: taking advantage of new technologies and creating new technologies of our own. The intention is to provide a complete range of fully featured systems ranging from ultra low power devices suitable for solar/wind power up to the largest LCD and LED panels currently available. What's more, we have designed our systems so that custom solutions are relatively simple to create, not just in terms of the construction but also in terms of the displays and how the data is presented. All systems share internal components, in particular computers and software, and hence can offer the customer an integrated package of systems serving a wide variety of needs. All systems run the same highly specified software suite (PROMETHEUS) which
has been built from the ground up to cater for all potential requirements. • Common internal hardware (HERMES) thus providing an integrated and seamless
system architecture | |||||||||